Production Rate

TKCM's increased the water production by 35% from 950 l/sec to 1,275 l/sec. The graph below shows the average treated water production per month. Production Rate Graph


Volume Rate


Pressure Rate

News and Events

HANDING OVER OF THE CIKOKOL PLANT TO TKCM

Plant Overview

The Cikokol Water Treatment Plant is located on the eastern bank of the Cisadane River, in the Tangerang region of Indonesia.

Water Production Rate

The graph below shows the latest treated water production rates at the Cikokol plant (litres/sec):