Current Project

The current projects include all urgent rehabilitation works with emphasis on the works required to improve the reliability of the plant operation, both in term of quantity and quality. Below is a list of projects with images.

The works already completed or under implementation include:

Overhaul Intake Pump No. 4
View Image

Overhaul Intake Pump No. 3
View Image

Install new sludge scrapper in Sedimentation Tank No. 6
View Image

Install AMF panel (for generator's operation)
View Image

Install new generator - 1500 KVA
View Image

Install new panel (for utility equipments' operation)
View Image

Install new flow meter on distribution pipe ND 900
View Image

Install new motorized valve on distribution pump No. 2 and 4's outlet pipes
View Image

Install 315 KW inverter on distribution pumps
View Image

Install 200 KW inverter on distribution pumps
View Image

New Online Computerized Monitoring System
View Image

Installation of new Package WTP's submersible pump
View Image

Lining and coating with epoxy - 12 Filter Tanks
View Image

Installation of new main power panel
View Image

Overhaul blower
View Image

Installation of new Tube Settlers in 6 Sedimentation Tanks (on going)
View Image

Replacement of the Raw Water Pumps
View Image

Addition of temporary screens at the intake
View Image

New automatic dosage of coagulant according to the raw water turbidity
View Image

Improvement of the Flocculation tanks isolating gates
View Image

New Flocculators control panel
View Image

Repair of the sedimentation tanks clarified water troughs
View Image

Repair of the sedimentation tanks scraper cable system and new control panel
View Image

Rehabilitation of 3 filters and backwash pumps
View Image

Addition of a new Chlorinator and overhaul of the existing one
View Image

Rehabilitation of the chlorine leakage neutralization system
View Image

Clear water tanks manual valves replaced by motorized one
View Image

Installation of a new magnetic flowmeter (Distribution)
View Image

Rehabilitation of the main electrical panels
View Image

New Data Control system and on-line recorders (PH, Turbidity, Residual Chlorine)
View Image

New Laboratory instruments
View Image

News and Events

HANDING OVER OF THE CIKOKOL PLANT TO TKCM

Plant Overview

The Cikokol Water Treatment Plant is located on the eastern bank of the Cisadane River, in the Tangerang region of Indonesia.

Water Production Rate

The graph below shows the latest treated water production rates at the Cikokol plant (litres/sec):